7.521.

Well, it got worse. It got so bad that I find myself wondering how it possibly could have gotten this bad. We are in the midst of a logic defying trainwreck in the Talis-household. I take total responsibility. Let me break down the problem:

When laying tile I believe I switched directions at one point. Where I had been going from bottom to top of the wall, I shifted to top to bottom. During that time micro cracks had begun to form, pushing the once straight (and new, because as I mentioned yesterday, I had to do it over) tile line down on a slight angle. Somewhere near the middle the entire thing began to look odd. The choice was made to keep going across the top, because that part looked good. However, once I started going down, the line became more and more crooked. Huge cracks began sprouting up as one tile would not lay evenly next to the other. Finally it reached the stage where the tiles were completely disconnected. This is where we are now. Lady Talis is doing her best to address the situation as I sit and blog and try to let my subconscious process exactly how I screwed this up. She’s called me back in to see her results, which is just as well because ten minutes is up and I’ve figured out exactly nothing.

Leave a Reply

Your email address will not be published. Required fields are marked *